S-34.1, r. 1 - Regulation respecting petroleum exploration, production and storage in a body of water

Full text
64. The authorization holder must, at least 24 hours before, notify the Minister of the rig release and, in the case of a temporary interruption, the holder must also notify the Minister as soon as possible of the resumption of the work.
O.C. 1251-2018, s. 64.
In force: 2018-09-20
64. The authorization holder must, at least 24 hours before, notify the Minister of the rig release and, in the case of a temporary interruption, the holder must also notify the Minister as soon as possible of the resumption of the work.
O.C. 1251-2018, s. 64.